10 original HCSA-Sales-Data Center Facility exam practice questions with answers and explanations.

Covers Cooling And Thermal Management, Data Center Deployment And Commissioning, Data Center Facility Solution Architecture, Energy Efficiency And Sustainability and 6 more.

Question types: single answer, multiple answers, drag and drop, dropdown and order list. A new question is added every 15 days.

10 questions

Huawei H19-105_V2.0 Practice Questions

Question 1

Topic: Data Center Facility Solution Architecture

Single Answer

A regional bank is consolidating two server rooms into a new facility. The site must support a phased initial deployment, with racks added over three years, and the bank wants to avoid rebuilding power and cooling infrastructure as IT load grows. The building footprint is fixed, and management requires a solution that can be deployed with a predictable schedule rather than a bespoke construction project. The initial IT load is modest, but the target capacity is substantially higher. Which Huawei solution approach best addresses the expansion and delivery constraints?

Correct answer: A

A modular data center supports phased deployment and capacity expansion while reducing the need to redesign the facility for each growth stage. Building for the ultimate load immediately increases upfront cost and may leave equipment operating inefficiently. A container-only first phase followed by a redesign does not provide the requested coherent expansion path. A conventional raised-floor room with a later cooling-plant project adds construction dependencies and schedule risk.

Question 2

Topic: Power Supply And Distribution

Multiple Answers

A colocation operator is reviewing the power architecture for a new Huawei data center deployment. Each critical IT load must remain supplied when either utility input is unavailable, and maintenance of one power path must not require shutting down the load. The operator has two independent utility feeds and can fund duplicated critical power paths, but it does not require duplicated noncritical office circuits. The design review team is comparing power distribution concepts before equipment selection. Which two design decisions best meet the stated resilience requirement? (Choose two.)

Correct answer: B, C

Independent A and B paths allow dual-input IT equipment to continue operating during a failure or maintenance event on one path. Preserving independence from the utility feeds through critical distribution avoids a shared upstream dependency that would defeat the intended resilience. A spare circuit on one path does not create path diversity. A shared UPS output bus and common branch circuit each leave a single point whose failure or maintenance can interrupt the load.

Question 3

Topic: Cooling And Thermal Management

Single Answer

A systems integrator is planning a high-density compute zone for an enterprise data center. The customer expects cabinet power density to vary significantly between rows, and wants cooling capacity to follow the actual IT heat load rather than keeping the entire room at a low temperature. The existing building has limited space for additional air-handling equipment, and the customer will not approve a raised-floor reconstruction. Which design approach is the best fit for the stated constraints?

Correct answer: D

Aisle containment reduces mixing of hot and cold air, while capacity-matched precision cooling directs cooling resources toward the high-density zone and its actual load. Uniform overcooling consumes energy without addressing localized airflow needs. Raising the floor conflicts with the no-reconstruction constraint and is not necessary for contained airflow. Sizing every room for its peak load increases space and equipment demands despite the customer's variable row densities.

Question 4

Topic: Facility Monitoring And Management

Drag And Drop

A data center operator is consolidating monitoring for a Huawei facility. The operations team needs to distinguish room-level environmental measurements from equipment-level status and electrical measurements, and it wants alarms to be routed to the responsible technicians without replacing local controller functions. Match each operational requirement to the appropriate monitoring source.

Drag each item onto its matching target. On a phone: tap an item, then tap a target.

Monitor temperature and humidity at representative locations in the room
Collect operating status and alarms from a UPS
Coordinate facility-wide monitoring and alarm presentation
Track incoming and branch-circuit electrical measurements
UPS controller
Environmental sensors
Power monitoring devices
Data center management platform
Correct answer:
  • Monitor temperature and humidity at representative locations in the room → Environmental sensors
  • Collect operating status and alarms from a UPS → UPS controller
  • Track incoming and branch-circuit electrical measurements → Power monitoring devices
  • Coordinate facility-wide monitoring and alarm presentation → Data center management platform

Environmental sensors provide room-condition measurements, while a UPS controller reports the UPS's own status and alarms. Power monitoring devices supply electrical measurements from the monitored distribution points. The data center management platform brings facility information together for monitoring and alarm handling. Treating a UPS controller as the room sensor source misses environmental coverage, and using the management platform as a substitute for field measurements confuses aggregation with sensing.

Question 5

Topic: Fire Protection And Life Safety

Single Answer

A facility owner is fitting out a server room in an occupied office building. The owner requires automatic detection and suppression appropriate for sensitive electronic equipment, while preserving safe evacuation and coordination with the building's fire alarm system. Water-based suppression in the IT room is unacceptable, and the contractor proposes immediate discharge on a single detector signal to minimize equipment loss. Which design decision is most appropriate?

Correct answer: B

A clean-agent system is suited to protecting electronic equipment without using water in the IT room, but its detection, release, alarms, and life-safety interfaces must be engineered together. Immediate discharge on one detector signal, as proposed, risks an unwanted release and disregards evacuation coordination. A water sprinkler conflicts with the explicit suppression constraint. Portable extinguishers cannot replace automatic detection and suppression for the stated facility risk.

Question 6

Topic: Data Center Deployment And Commissioning

Order List

A customer is preparing to commission a modular data center after delivery to its site. The modules have been positioned, but facility power and communications interfaces have not yet been fully verified. The customer requires a controlled handover, documented acceptance, and no energization of IT loads before the supporting infrastructure is confirmed ready. Arrange the steps in the order they should be performed.

Drag the steps into the correct order, or use the arrows.

  1. Test monitoring, alarms, and inter-module communications
  2. Energize IT loads and perform integrated acceptance checks
  3. Verify module installation and site interface connections
  4. Complete power-on checks for supporting facility systems
Correct answer:
  1. Verify module installation and site interface connections
  2. Complete power-on checks for supporting facility systems
  3. Test monitoring, alarms, and inter-module communications
  4. Energize IT loads and perform integrated acceptance checks

The site and module connections must be verified before equipment is energized. Supporting facility systems are then checked and powered on, followed by validation of monitoring, alarms, and communications. Only after those prerequisites pass should IT loads be energized for integrated acceptance. Starting IT loads before validating facility power and communications would violate the customer's readiness requirement and make faults harder to isolate.

Question 7

Topic: Physical Security And Access Control

Dropdown

A financial services customer requires that only authorized staff enter the data center, that access events be attributable to individuals, and that alarms from forced entry reach the security team. The customer does not want a shared PIN that can be passed between contractors. Complete the access-control design statement.

Choose the correct value for each blank.

Use to verify an individual's identity at the controlled entrance, retain for access traceability, and configure to report forced-door events.
Correct answer:

Use individual access credentials to verify an individual's identity at the controlled entrance, retain access event logs for access traceability, and configure door alarms integrated with the security monitoring system to report forced-door events.

Individual credentials make access attributable to a person, and access event logs preserve the record needed for review. Integrating forced-door alarms with security monitoring directs the event to the team responsible for response. A shared PIN undermines attribution, while a mechanical key held at reception does not provide the requested electronic audit trail. Headcounts and maintenance schedules are not access logs, and cooling or power devices do not report door events.

Question 8

Topic: Energy Efficiency And Sustainability

Single Answer

A data center operator is setting an efficiency improvement plan for a facility with fluctuating IT utilization. Finance will approve changes only if they reduce avoidable facility energy use without weakening equipment reliability. The current team proposes lowering all cooling setpoints as a precaution and comparing monthly utility bills, but IT load changes seasonally and the proposed comparison would not isolate facility performance. Which measurement and operating approach is best?

Correct answer: A

Comparing facility energy with IT energy using a consistent boundary provides a meaningful efficiency measure, and optimizing cooling within equipment limits avoids trading reliability for lower consumption. Lower setpoints can increase cooling energy and total bills alone do not isolate efficiency from changes in IT load. Permanently disabling redundant cooling can compromise resilience. An unnormalized comparison with another site cannot establish whether this facility improved.

Question 9

Topic: Operations And Maintenance

Multiple Answers

A hospital data center has a planned maintenance window for one UPS module. Clinical systems must remain available, and the facility team must preserve the intended redundant power arrangement throughout the work. The UPS is monitored centrally, and the maintenance provider is available to perform the approved procedure. The team proposes beginning work after a visual inspection because the remaining module appears healthy. Which two actions should be completed before maintenance begins? (Choose two.)

Correct answer: C, D

Before isolating a UPS module, the team must verify that the remaining path can carry the protected load and that the maintenance state preserves the required availability. Following the approved procedure with operations and the provider reduces sequencing and coordination risk. Suppressing alarms removes important visibility. An unverified bypass path can introduce a new failure exposure, and a normal display alone does not establish that downstream capacity and transfer conditions are safe.

Question 10

Topic: Modular Data Center Site Planning

Single Answer

A customer wants to deploy a Huawei modular data center on a constrained industrial site. The schedule is short, but the site has limited access for large transport vehicles, strict local requirements for fire access, and an existing utility connection whose capacity must be confirmed before equipment delivery. The sales team is asked to recommend the first planning action that avoids committing to a module arrangement that cannot be installed or operated. What should the team do first?

Correct answer: D

Validating the site, access route, utilities, and local requirements before fixing the layout prevents an undeliverable or noncompliant design. Selecting the maximum configuration before checking transport and installation clearances risks an unusable delivery. Assuming utility capacity from the rack plan does not verify the actual supply constraint. Deferring code and access checks until commissioning is too late to address site changes safely or economically.