After the battery module is installed, the torque and insulation should be checked according to the specified requirements.
This statement is true because post-installation verification is a mandatory acceptance step for battery systems in data centers. After a battery module is installed, torque verification ensures that all power terminals, interconnect bars, and grounding points meet the specified tightening requirements. If torque is too low, contact resistance increases, which can cause abnormal heating, voltage drop, nuisance alarms, and even connector damage during high current charge/discharge. If torque is too high, threads, lugs, or busbars can be damaged, creating hidden reliability risks. Insulation testing confirms that the battery circuit has no unintended leakage paths to chassis or ground and that cable routing, connector seating, and protective covers are correct. This is especially important for lithium battery cabinets where high DC voltage and large fault current capability demand strict electrical isolation. Performing torque and insulation checks after installation reduces early-life faults, improves safety, and ensures the cabinet can pass commissioning tests and enter stable service under UPS charge/discharge control.