Limited-Time Offer: Enjoy 50% Savings! - Ends In 0d 00h 00m 00s Coupon code: 50OFF
Welcome to QA4Exam

Free practice questions with explanations

Free Nokia 4A0-C03 Exam Dumps and Practice Questions

15 original Nokia NRS II Composite Exam: IS-IS version practice questions with answers and explanations.

Covers IS-IS Addressing And NET Design, IS-IS Authentication And Security, IS-IS DIS And LAN Operation, IS-IS Database Synchronization And Operations and 11 more.

Question types: single answer, multiple answers, order list, drag and drop and dropdown. A new question is added every 15 days.

15 questions

Nokia 4A0-C03 Practice Questions

Question 1

Topic: IS-IS Fundamentals And Adjacency Formation

Single Answer

A regional provider is migrating a dual-stack backbone from OSPF to IS-IS. Two Nokia 7750 SR routers share an Ethernet segment and must form an adjacency without changing the existing IP addressing. Both routers are intended to operate as Level 2 only, and the operations team wants to avoid accepting unnecessary Level 1 database information. Which configuration approach best meets the requirement?

Correct answer: B

Level 2-only routers can form a Level 2 adjacency without matching area addresses, and unique system IDs distinguish their IS-IS identities. Level 1-only operation would not satisfy the specified Level 2 backbone role. A Level 1 router cannot form the required Level 2 adjacency with a Level 2-only peer. Dual-level operation adds Level 1 participation and the area-address dependency that the design does not require.

Question 2

Topic: IS-IS Addressing And NET Design

Single Answer

An operator is adding a new Level 2 router to a Nokia SR OS network. The design uses a single IS-IS area and requires the new router to be uniquely identified while preserving the common area identity used by existing routers. The implementation team has been asked to validate the NET before turning up links; no IP interface changes are planned. Which NET property is the key validation?

Correct answer: A

A NET carries an area address, a system ID, and an N-selector. For the stated common-area design, the new router should use the existing area identity while retaining a unique system ID. Reusing a neighbor's system ID risks an identity collision. A unique area is not required by the design, and the N-selector is not an encoding of the IPv4 mask.

Question 3

Topic: IS-IS Interface Configuration

Multiple Answers

A service provider is enabling IS-IS on a Nokia 7750 SR backbone interface carrying IPv4 and IPv6. The interface must establish ordinary IS-IS adjacencies, advertise both address families, and avoid making the interface passive. The IP interfaces are already operational and have addresses configured. Which two configuration actions are required on the relevant SR OS interface and IS-IS context? (Choose two.)

Correct answer: C, E

IS-IS must be enabled for the appropriate level on the routed interface, and IPv6 reachability requires IPv6 support in the IS-IS instance. Passive mode suppresses adjacency formation on the interface, so it conflicts with the requirement. A system ID must identify the local router uniquely, not be shared with the peer. NET area information is not used as an IP interface address.

Question 4

Topic: IS-IS Levels And Area Design

Single Answer

A large enterprise has several Level 1 areas connected through a Level 2 backbone. A new boundary router must provide reachability between its local area and the backbone while keeping local-area topology out of the Level 2 domain. Existing routers use consistent area addressing, and no redesign is approved. Which role should the new boundary router perform?

Correct answer: B

A Level 1/Level 2 router is the appropriate boundary role: it participates in the local Level 1 domain and connects that domain to the Level 2 backbone. Level 1-only operation cannot provide the required backbone connection. Level 2-only operation would not participate in the local Level 1 area. Suppressing the Level 2 adjacency removes the very inter-area connectivity the boundary router must provide.

Question 5

Topic: IS-IS Metrics And Traffic Engineering

Dropdown

A backbone engineer is standardizing path costs across routers running SR OS. The design uses the extended metric style so that traffic engineering can use metric values beyond the narrow-metric range. The engineer is reviewing the interface-level metric configuration and must select the correct metric style and level setting. Complete the configuration values.

Choose the correct value for each blank.

For the IS-IS interface, configure metric style and apply the metric to .
Correct answer:

For the IS-IS interface, configure metric style wide and apply the metric to both Level 1 and Level 2.

Wide metrics support the larger metric range used by modern IS-IS traffic-engineering designs. Applying the intended metric at both levels keeps the cost policy consistent wherever the router participates in Level 1 and Level 2. Narrow metrics retain the limited range. The hybrid styles are not the requested uniform extended-metric configuration, and applying the metric to only one level would leave the other level outside the stated policy.

Question 6

Topic: IS-IS DIS And LAN Operation

Single Answer

Two SR OS routers on a broadcast Ethernet segment have formed an IS-IS adjacency, but the operations team is validating how the segment will be represented in the link-state database. A change request proposes increasing the configured priority on one router so it will reliably be the designated intermediate system after any router restart. No other election controls are being changed. What is the best assessment?

Correct answer: D

DIS election on a broadcast network uses interface priority, with system ID serving as a tie-breaker. A higher priority makes a router preferred, but IS-IS permits a new election and a router joining or recovering can cause the DIS to change. The process is not an unconditional preemptive guarantee. System ID does not override a higher priority, and Level 2 operation does not prevent DIS election on Ethernet.

Question 7

Topic: IS-IS Authentication And Security

Multiple Answers

A regulated network requires IS-IS control packets on a backbone link to be authenticated, and the security team mandates that both LSPs and the hello packets used to form adjacencies be covered. The routers are Nokia SR OS systems running a supported common authentication method, and the migration must not rely on IPsec or on authentication at only one protocol packet scope. Which two packet scopes must the engineer configure for authentication? (Choose two.)

Correct answer: A, C

The stated policy explicitly covers both link-state advertisements and adjacency-establishing hello packets, so LSP authentication and hello authentication are both required. Authenticating only an IP interface does not apply IS-IS packet authentication. SNP-only protection leaves LSPs and hellos outside the required scope. A NET identifies the IS-IS system and is not an authentication configuration point.

Question 8

Topic: IS-IS Route Preference And Redistribution

Single Answer

A dual-protocol migration has left a prefix reachable through both an IS-IS route and a route redistributed from another protocol. Both routes are otherwise eligible, but the forwarding table selects the redistributed route even though the IS-IS metric is lower. The design team wants IS-IS to win without changing link metrics or modifying the other protocol's route calculation. Which SR OS control should be reviewed first?

Correct answer: A

Route preference determines which eligible route source is preferred for installation when competing protocols provide the same destination. IS-IS metrics select paths within IS-IS; they do not override inter-protocol route preference. DIS priority affects broadcast LAN database operation, not route-source selection. The NET N-selector does not control route installation preference.

Question 9

Topic: IS-IS Troubleshooting And Adjacency Bring-Up

Order List

A maintenance window is scheduled to add a new router to an existing Level 2 backbone. The router is reachable at the IP layer, but an IS-IS adjacency does not appear. The team must use a safe diagnostic sequence that isolates identity and level mismatches before making configuration changes, then verifies adjacency and database synchronization. Arrange the steps in the order they should be performed.

Drag the steps into the correct order, or use the arrows.

  1. Confirm the adjacency reaches Up and the Level 2 database synchronizes.
  2. Check hello reception and inspect any adjacency rejection reason.
  3. Compare the configured NET and confirm the system ID is unique.
  4. Verify both interfaces are operational and enabled for Level 2 IS-IS.
Correct answer:
  1. Compare the configured NET and confirm the system ID is unique.
  2. Verify both interfaces are operational and enabled for Level 2 IS-IS.
  3. Check hello reception and inspect any adjacency rejection reason.
  4. Confirm the adjacency reaches Up and the Level 2 database synchronizes.

Start by validating the IS-IS identity, since a duplicate system ID or malformed NET can undermine participation. Next confirm the physical and protocol interface state and that both peers participate at Level 2. Once those prerequisites are sound, hello reception and rejection diagnostics identify remaining negotiation problems. The final verification is an Up adjacency followed by consistent Level 2 database synchronization. Changing configuration before these checks risks masking the actual fault.

Question 10

Topic: IS-IS Overload And Convergence

Single Answer

A core router is undergoing a controlled software restart and must remain reachable for management, but transit traffic should avoid it while its forwarding state is rebuilding. Its attached prefixes must remain usable, and the operator wants the network to reconverge away from the router without removing its identity from the topology. Which IS-IS mechanism best fits this requirement?

Correct answer: A

The IS-IS overload indication tells other routers not to use the advertising router as a transit point while preserving its participation and reachability to directly attached destinations. Disabling all IS-IS interfaces removes the router from the topology rather than preserving management reachability. Changing the system ID creates a different IS-IS identity and is not the controlled transit-avoidance mechanism. Zero metrics attract traffic instead of draining it.

Question 11

Topic: IS-IS Topology And Interface Types

Drag And Drop

A provider is documenting how different IS-IS link types affect adjacencies and database representation before standardizing its backbone templates. The architecture team wants each operational requirement mapped to the appropriate link type. Match each requirement to the link type that meets it.

Drag each item onto its matching target. On a phone: tap an item, then tap a target.

Routed edge where prefixes should be advertised without forming a neighbor adjacency
Point-to-point link requiring a direct two-router adjacency
Shared Ethernet segment requiring DIS election and pseudonode representation
Broadcast interface
Point-to-point interface
Passive interface
Correct answer:
  • Point-to-point link requiring a direct two-router adjacency → Point-to-point interface
  • Shared Ethernet segment requiring DIS election and pseudonode representation → Broadcast interface
  • Routed edge where prefixes should be advertised without forming a neighbor adjacency → Passive interface

A point-to-point interface models the direct relationship between two routers. A broadcast interface supports a multiaccess LAN, including DIS election and pseudonode LSP behavior. A passive interface advertises the associated reachability without sending IS-IS hellos to establish an adjacency on that interface. Treating a shared LAN as point-to-point misses its multiaccess behavior, while making an adjacency-required link passive prevents the required neighbor relationship.

Question 12

Topic: IS-IS IPv6 Support

Single Answer

A service provider has stable IPv4 IS-IS routing on its SR OS backbone and is adding IPv6 reachability over the same topology. Neighbor adjacencies are already up, and the IPv6 prefixes are correctly configured on the routed interfaces, but IPv6 routes do not appear in the IS-IS database. The change must preserve the existing IPv4 operation and must not create a separate IS-IS instance. What is the best next step?

Correct answer: A

IPv6 prefix exchange requires IPv6 to be enabled in the existing IS-IS instance, in addition to correctly configured IPv6 interfaces. This preserves the current adjacency and IPv4 routing while adding the IPv6 address family. The NET is not replaced by an IPv6 address. Passive interfaces suppress neighbor formation and cannot solve a missing address-family configuration. IPv6 does not require Level 1-only operation.

Question 13

Topic: IS-IS Route Policy And Prefix Control

Single Answer

A network team is redistributing selected static routes into Level 2 IS-IS from a Nokia SR OS edge router. A compliance rule permits only prefixes from an approved allocation list; all other static routes must remain absent from IS-IS. The edge router also learns several dynamic routes that must not be affected by this change. Which approach best enforces the policy?

Correct answer: D

An export policy can explicitly match the approved static prefixes and control which routes are advertised into IS-IS, while leaving unrelated dynamic routes unaffected. Metrics influence path selection, not whether an unapproved prefix is exported. Area boundaries do not implement a prefix allowlist for redistributed static routes. Passive interface behavior suppresses adjacency formation; it does not filter redistributed routes by prefix.

Question 14

Topic: IS-IS Database Synchronization And Operations

Order List

Following a planned link restoration, operators see a temporary mismatch between the Level 2 link-state databases on two backbone routers. The routers are in the same domain, and no topology redesign is involved. Before declaring a routing defect, the team must verify protocol state in a sequence that moves from connectivity to adjacency, then to database exchange and route calculation. Arrange the checks in the order they should be performed.

Drag the steps into the correct order, or use the arrows.

  1. Verify the resulting SPF routes and forwarding entries.
  2. Check LSP flooding and sequence-number synchronization between peers.
  3. Confirm the physical link and IS-IS-enabled interfaces are operational.
  4. Verify the expected Level 2 adjacency is Up.
Correct answer:
  1. Confirm the physical link and IS-IS-enabled interfaces are operational.
  2. Verify the expected Level 2 adjacency is Up.
  3. Check LSP flooding and sequence-number synchronization between peers.
  4. Verify the resulting SPF routes and forwarding entries.

Physical and interface state are prerequisites for any protocol exchange. The adjacency must then be established at the intended level before database synchronization can be assessed. LSP flooding and sequence numbers establish whether the peers have converged on consistent link-state information. Only after that should the operator evaluate SPF results and installed forwarding entries. Investigating routes before confirming the database can lead to incorrect conclusions about the cause.

Question 15

Topic: IS-IS LSP Lifetime And Database Stability

Single Answer

A network operations center is investigating a router that intermittently retains an obsolete topology entry after losing contact with a remote system. The remote system is not reachable for a controlled shutdown, and the operator must distinguish normal aging behavior from a persistent stale entry. The team is not authorized to clear the entire IS-IS database or change refresh timers during business hours. Which action is the most appropriate first step?

Correct answer: C

Inspecting the specific LSP's lifetime, sequence number, and purge state is a low-impact way to determine whether the entry is aging normally, being refreshed, or has been withdrawn. Restarting IS-IS across the network is disruptive and exceeds the authority granted. Metrics can alter path selection but do not remove stale database content. Changing the local NET changes router identity and does not selectively resolve an obsolete remote LSP.

More Nokia practice questions

Unlock all Nokia 4A0-C03 questions

Full exam access, validated answers, and unlimited practice with no download limits.